Campground Zoning is…Simple? Wait, that may’t be proper.

[ad_1]

This publish might include affiliate hyperlinks. See our affiliate disclaimer right here.

After we determined to construct a campground as an alternative of shopping for a campground, we knew it will include dozens of extra challenges.

Working with engineers on designs.

Determining what number of websites we will match.

How large every website needs to be.

Discovering a contractor.

All of the issues.

After which the one factor that everybody dreads probably the most: rezoning.

Zoning has a horrible popularity of being an advanced bureaucratic course of. One of many two parcels of land that may make up our park is already zoned industrial, the opposite is zoned agriculture. So we wanted to undergo the beautiful strategy of getting a particular use allow that will enable us to construct on all our acreage.

And it was…straightforward.

Like print two items of paper and pay a price.

We dropped off the paperwork and a test and had been instructed that will hear again in three weeks.

Certain sufficient, three weeks later we bought an inventory of questions and clarifications wanted from public works, the hearth division, transportation, and many others. We answered all their questions (Will there be picnic tables or hearth rings at each website? Anticipated size of keep for campers?) and snuck into the subsequent metropolis planning assembly on November 18th—this week!

The method was all collectively painless.

We watched from our safety digicam when somebody from town confirmed up and hung an indication on our fence saying our upcoming listening to. The whole lot was coming collectively so easily!


UNTIL.

Shortly after every little thing was confirmed with our listening to—the ultimate step earlier than we will verify timelines for breaking floor with our contractor and subcontractors—we get a name.

Right here’s the place issues bought complicated.

Apparently for the previous six months, town has been engaged on creating a brand new zoning classification particularly for RV parks and campgrounds. The brand new zone needs to be created the primary week of December.

So we get a name that the allow we utilized for isn’t appropriate. We wanted to use to be zoned as an RV park.

Which doesn’t even exist as a zone.

But.

🤔

Fairly just a few cellphone calls later, we’re lastly on the identical web page as town. Our listening to is now pushed again to December so the zoning we’d like will exist so we will really apply for it…

Assuming that the brand new sort of zone is permitted to be created at their subsequent assembly.

Unnecessarily difficult and completely on par with the popularity zoning has. We must always’ve identified after we utilized so simply that there could be just a few hidden bumps within the highway!

Fingers crossed that we are going to be correctly zoned earlier than the top of the 12 months and carry on monitor to interrupt floor in January!